CONVERSION WORK

Back to Water Run

Panoramas    Work

Panoramas of the layout

Back to Water Run

Work to convert the Automatic High scenic boards to Water Run

General: add legs, buildings, check the electrics making any changes required, paint the new back scenes,
paint & ballast track, and scenic makeover particularly for the rivers & insuring there's no change of style at joints.

Board 1 -
remove goods shed
, lift track (from point) to left, strengthen back scene, add left hand back scene, lay track, point, & rod, and factory in left hand corner.

Board 2 -
slew track at both ends and add pine trees.

Board 3 - move point, rod, & lengthen spur and new front board.

Board 4 - Lift track (from bridge) to right and add right hand back scene.

Back to Water Run