Springhead Deep

Gn15, British narrow gauge mine railway, 8 by 1 foot


Video

Working Face        Unloading area

Automatic layouts (Tube)

Springhead Deep

Mexican

Main Street & City

Subway

 
Springhead Deep is an adit mine and has a 15 inch narrow gauge railway linking the working
face and the unloading point. The railway brings in pit props (timber) etc and takes out the ore.

 

Working Face

Back to layouts page

 

Unloading area

Back to layouts page