Llanengan

00 Llŷn Tramway

       
Concept the layout will use the fiddle yard and left from operator u-turn board (photos of the u-turn are below) from Halfway House.
A new station board will be added this will comprise a loop with platform,
a general goods siding, a siding serving a mine, and a siding serving an industry.
To emphasise the tram aspect set track point and 250mm radius curves will be used.
The set track points and particularly the 250mm radius curves will constrain the stock used on the layout.
Stock is under development  however most four wheel and short wheel base six wheel stock should, couplings permitting, run on the layout.

    
  

Mock up


Stock

Loco and coaches for the layout